WRU GB 5M-9-8-22
API 43047347530000 · Uintah County, Utah · WHITE RIVER field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 0 | 375 | 62 | 30 |
| May 2026 | 2 | 346 | 102 | 31 |
| Apr 2026 | 10 | 514 | 123 | 30 |
| Mar 2026 | 0 | 489 | 55 | 21 |
| Feb 2026 | 0 | 0 | 0 | 0 |
| Jan 2026 | 0 | 241 | 135 | 21 |
| Dec 2025 | 0 | 323 | 5 | 31 |
| Nov 2025 | 0 | 318 | 46 | 30 |
| Oct 2025 | 32 | 315 | 21 | 31 |
| Sep 2025 | 0 | 298 | 47 | 30 |
| Aug 2025 | 0 | 278 | 17 | 31 |
| Jul 2025 | 8 | 340 | 65 | 31 |
| Jun 2025 | 7 | 248 | 3 | 30 |
| May 2025 | 3 | 234 | 22 | 31 |
| Apr 2025 | 8 | 159 | 2 | 30 |
| Mar 2025 | 1 | 296 | 68 | 31 |
| Feb 2025 | 21 | 291 | 77 | 28 |
| Jan 2025 | 0 | 329 | 60 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2005-08-11 | 25 | 331 | 213 | — | — | 24 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.138952, -109.452873
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.