GB 4D-28-8-21

API 43047352460000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047352460000
Operator
KODA Uinta, LLC
County
Uintah
Measured depth
16,775 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
395 bbl
Cumulative gas
86,728 MCF
Cumulative water
5,184 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202672,5222559
May 2026504,32821830
Apr 2026254,79937330
Mar 2026184,85423531
Feb 202644,41119928
Jan 2026244,90328031
Dec 2025284,90829031
Nov 2025414,84234730
Oct 202555,17425131
Sep 2025285,08536530
Aug 2025135,27922331
Jul 2025355,28838231
Jun 2025185,11026330
May 2025125,26140031
Apr 2025205,06831830
Mar 2025155,19826531
Feb 2025304,68024028
Jan 2025225,01828031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALSGW
Completed
2006-06-07
First production
2006-06-07
Measured depth
16,665 ft
True vertical depth
16,665 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2006-06-0902,7012,399———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

REPERF

Location

40.099960, -109.566168

40.09996, -109.56617 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.