NBE 11M-17-9-23

API 43047354660000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047354660000
Operator
KODA Uinta, LLC
County
Uintah
Measured depth
9,150 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
417 bbl
Cumulative gas
26,992 MCF
Cumulative water
1,267 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026321,5638530
May 2026191,6238831
Apr 202651,5568230
Mar 2026441,5236831
Feb 2026221,3876528
Jan 2026361,5175231
Dec 2025281,5669331
Nov 2025121,5357930
Oct 2025311,5945531
Sep 2025221,5508230
Aug 2025181,6796931
Jul 2025281,7298231
Jun 2025131,4255030
May 2025131,0073221
Apr 2025201,3487329
Mar 2025221,5365531
Feb 202591,3977228
Jan 2025431,4578531

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Spudded
2004-12-23
Completed
2005-02-26
First production
2005-02-26
Measured depth
9,088 ft
True vertical depth
9,088 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2005-02-28931,014600——15

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

PGW

Location

40.034040, -109.352777

40.03404, -109.35278 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.