Federal 4-33-8-18
API 43047359770000 · Uintah County, Utah · 8 MILE FLAT NORTH field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 152 | 186 | 170 | 30 |
| May 2026 | 243 | 109 | 42 | 31 |
| Apr 2026 | 191 | 170 | 17 | 30 |
| Mar 2026 | 210 | 77 | 336 | 31 |
| Feb 2026 | 59 | 114 | 71 | 12 |
| Jan 2026 | 160 | 193 | 117 | 31 |
| Dec 2025 | 90 | 109 | 202 | 31 |
| Nov 2025 | 140 | 91 | 87 | 23 |
| Oct 2025 | 68 | 188 | 148 | 24 |
| Sep 2025 | 207 | 95 | 203 | 27 |
| Aug 2025 | 56 | 178 | 174 | 27 |
| Jul 2025 | 76 | 95 | 210 | 31 |
| Jun 2025 | 223 | 90 | 229 | 27 |
| May 2025 | 77 | 84 | 275 | 30 |
| Apr 2025 | 134 | 88 | 284 | 30 |
| Mar 2025 | 177 | 27 | 255 | 20 |
| Feb 2025 | 0 | 42 | 7 | 9 |
| Jan 2025 | 77 | 68 | 235 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2006-03-31 | 48 | 31 | 21 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.080520, -109.905598
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.