SUBW 14M-7-7-22

API 43047361360000 · Uintah County, Utah · HORSESHOE BEND field

PGW
API
43047361360000
Operator
KODA Uinta, LLC
County
Uintah
Measured depth
17,500 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
788 bbl
Cumulative gas
69,231 MCF
Cumulative water
15,461 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026433,67585930
May 2026463,70484131
Apr 2026333,68763630
Mar 2026403,81678431
Feb 2026463,40856828
Jan 2026363,78084031
Dec 2025453,77687331
Nov 2025403,73182430
Oct 2025443,9581,02031
Sep 2025433,83181230
Aug 2025503,99699931
Jul 2025444,02290931
Jun 2025453,93582330
May 2025444,1191,00331
Apr 2025484,03591630
Mar 2025494,04993331
Feb 2025453,63985528
Jan 2025474,07096631

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Completed
2007-01-05
First production
2007-01-05
Measured depth
14,220 ft
True vertical depth
14,220 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2007-01-12391,8711,268——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

C

Location

40.220858, -109.485927

40.22086, -109.48593 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.