Federal 6-30-8-18

API 43047362440000 · Uintah County, Utah · 8 MILE FLAT NORTH field

POW
API
43047362440000
Operator
Scout Energy Management, LLC
County
Uintah
Measured depth
6,310 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
3,380 bbl
Cumulative gas
4,095 MCF
Cumulative water
6,053 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202621147039928
May 2026176030731
Apr 202619934332930
Mar 2026234035828
Feb 2026144229028
Jan 20261521633931
Dec 202518126631931
Nov 202512925734630
Oct 202516514029925
Sep 202520624932329
Aug 202517132033526
Jul 202521532835831
Jun 202522318137630
May 202520535232229
Apr 202518836335630
Mar 202516732430528
Feb 202518424031528
Jan 202523024437731

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2008-05-07
Completed
2008-06-19
First production
2008-06-24
Measured depth
6,330 ft
True vertical depth
6,330 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2008-07-0570235———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.090852, -109.938383

40.09085, -109.93838 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.