CWU 1103-20
API 43047371390000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 14 | 813 | 312 | 30 |
| May 2026 | 27 | 840 | 334 | 31 |
| Apr 2026 | 25 | 815 | 315 | 30 |
| Mar 2026 | 33 | 836 | 340 | 31 |
| Feb 2026 | 35 | 769 | 302 | 28 |
| Jan 2026 | 16 | 822 | 335 | 31 |
| Dec 2025 | 30 | 874 | 362 | 31 |
| Nov 2025 | 20 | 849 | 363 | 30 |
| Oct 2025 | 29 | 873 | 375 | 31 |
| Sep 2025 | 31 | 831 | 306 | 30 |
| Aug 2025 | 23 | 880 | 456 | 31 |
| Jul 2025 | 7 | 867 | 403 | 31 |
| Jun 2025 | 49 | 800 | 269 | 27 |
| May 2025 | 35 | 856 | 493 | 31 |
| Apr 2025 | 23 | 819 | 344 | 30 |
| Mar 2025 | 37 | 677 | 588 | 31 |
| Feb 2025 | 9 | 450 | 242 | 28 |
| Jan 2025 | 43 | 496 | 270 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2006-09-26 | 6 | 523 | 300 | — | — | 12 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.027406, -109.352562
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.