CWU 1243-02
API 43047383460000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 18 | 101 | 4 | 4 |
| May 2026 | 98 | 799 | 21 | 31 |
| Apr 2026 | 0 | 674 | 0 | 30 |
| Mar 2026 | 0 | 277 | 0 | 31 |
| Feb 2026 | 0 | 415 | 0 | 28 |
| Jan 2026 | 0 | 541 | 0 | 31 |
| Dec 2025 | 8 | 662 | 18 | 29 |
| Nov 2025 | 30 | 803 | 131 | 30 |
| Oct 2025 | 36 | 1,015 | 279 | 31 |
| Sep 2025 | 49 | 1,004 | 243 | 30 |
| Aug 2025 | 34 | 1,015 | 245 | 31 |
| Jul 2025 | 55 | 1,080 | 274 | 31 |
| Jun 2025 | 41 | 998 | 233 | 30 |
| May 2025 | 47 | 1,019 | 253 | 31 |
| Apr 2025 | 62 | 980 | 245 | 30 |
| Mar 2025 | 13 | 916 | 242 | 31 |
| Feb 2025 | 63 | 973 | 235 | 28 |
| Jan 2025 | 49 | 1,056 | 186 | 19 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2007-05-08 | 86 | 342 | 130 | — | — | 10 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.066780, -109.405036
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.