NBU 1022-5D-4T

API 43047385230000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047385230000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,130 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
338 bbl
Cumulative gas
41,055 MCF
Cumulative water
2,118 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026142,11310930
May 2026192,24210931
Apr 2026222,23913830
Mar 2026212,35416631
Feb 2026192,11115328
Jan 2026222,28916431
Dec 2025212,31812131
Nov 2025202,27111130
Oct 2025172,31811431
Sep 2025122,20211230
Aug 2025132,33710731
Jul 2025162,39811631
Jun 2025162,29110530
May 2025182,39310331
Apr 2025212,31710130
Mar 2025232,2169931
Feb 2025202,1909028
Jan 2025242,45610031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Spudded
2007-10-01
Completed
2007-12-13
First production
2007-12-13
Measured depth
8,962 ft
True vertical depth
8,962 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2007-12-1802,322730——15

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.983330, -109.469951

39.98333, -109.46995 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.