Hoss 36-30
API 43047387630000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 28 | 377 | 206 | 30 |
| May 2026 | 12 | 387 | 172 | 31 |
| Apr 2026 | 40 | 338 | 110 | 30 |
| Mar 2026 | 28 | 362 | 80 | 31 |
| Feb 2026 | 29 | 347 | 95 | 28 |
| Jan 2026 | 47 | 539 | 223 | 31 |
| Dec 2025 | 68 | 662 | 314 | 31 |
| Nov 2025 | 46 | 530 | 313 | 30 |
| Oct 2025 | 35 | 537 | 328 | 31 |
| Sep 2025 | 69 | 464 | 220 | 30 |
| Aug 2025 | 47 | 330 | 196 | 31 |
| Jul 2025 | 50 | 448 | 315 | 31 |
| Jun 2025 | 52 | 372 | 270 | 30 |
| May 2025 | 56 | 440 | 318 | 31 |
| Apr 2025 | 51 | 361 | 324 | 30 |
| Mar 2025 | 65 | 502 | 412 | 31 |
| Feb 2025 | 67 | 513 | 429 | 28 |
| Jan 2025 | 63 | 623 | 490 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2008-03-13 | 28 | 451 | 148 | — | — | 14 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.098526, -109.362930
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.