Federal 14-19-6-21
API 43047390790000 · Uintah County, Utah · HALFWAY HOLLOW field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 228 | 134 | 75 | 28 |
| May 2026 | 298 | 170 | 99 | 31 |
| Apr 2026 | 272 | 112 | 112 | 30 |
| Mar 2026 | 286 | 168 | 104 | 28 |
| Feb 2026 | 283 | 143 | 224 | 28 |
| Jan 2026 | 165 | 74 | 213 | 17 |
| Dec 2025 | 254 | 101 | 57 | 30 |
| Nov 2025 | 274 | 137 | 80 | 29 |
| Oct 2025 | 560 | 150 | 77 | 31 |
| Sep 2025 | 3 | 143 | 95 | 30 |
| Aug 2025 | 255 | 159 | 94 | 31 |
| Jul 2025 | 251 | 165 | 77 | 31 |
| Jun 2025 | 250 | 215 | 90 | 30 |
| May 2025 | 292 | 233 | 71 | 31 |
| Apr 2025 | 266 | 210 | 87 | 28 |
| Mar 2025 | 302 | 215 | 85 | 31 |
| Feb 2025 | 265 | 155 | 94 | 28 |
| Jan 2025 | 322 | 150 | 94 | 30 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-02-16 | 121 | 0 | 123 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.278941, -109.600657
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.