Ute Tribal 1-7-5-2E
API 43047392910000 · Uintah County, Utah · PARIETTE BENCH field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 88 | 232 | 13 | 30 |
| May 2026 | 100 | 241 | 30 | 31 |
| Apr 2026 | 58 | 198 | 0 | 11 |
| Mar 2026 | 91 | 213 | 13 | 31 |
| Feb 2026 | 82 | 109 | 16 | 28 |
| Jan 2026 | 119 | 116 | 0 | 30 |
| Dec 2025 | 83 | 144 | 39 | 31 |
| Nov 2025 | 109 | 130 | 0 | 30 |
| Oct 2025 | 91 | 137 | 14 | 26 |
| Sep 2025 | 130 | 182 | 0 | 27 |
| Aug 2025 | 81 | 149 | 18 | 31 |
| Jul 2025 | 101 | 138 | 23 | 31 |
| Jun 2025 | 93 | 335 | 14 | 30 |
| May 2025 | 103 | 366 | 16 | 31 |
| Apr 2025 | 105 | 342 | 6 | 30 |
| Mar 2025 | 111 | 184 | 23 | 31 |
| Feb 2025 | 108 | 168 | 21 | 28 |
| Jan 2025 | 78 | 358 | 32 | 19 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2008-01-15 | 204 | 0 | 112 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
REPERF
POWLocation
40.070099, -109.804704
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.