E Chapita 79-23

API 43047394420000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047394420000
Operator
Greylock Production, LLC
County
Uintah
Measured depth
8,500 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
526 bbl
Cumulative gas
18,647 MCF
Cumulative water
6,061 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20261697634630
May 2026161,02441931
Apr 2026391,06736630
Mar 2026261,00538531
Feb 20261798635828
Jan 2026481,16344131
Dec 2025591,10839131
Nov 2025151,15641430
Oct 2025411,17641431
Sep 2025431,08833830
Aug 2025121,20346531
Jul 2025351,20340431
Jun 2025421,04329028
May 2025461,19439531
Apr 2025351,16444030
Mar 2025141,32919531
Feb 2025012602
Jan 202522636024

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Spudded
2008-06-02
Completed
2008-07-08
First production
2008-07-08
Measured depth
8,550 ft
True vertical depth
8,550 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2008-07-1320743860——24

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.016520, -109.287770

40.01652, -109.28777 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.