Sundance Fed S-11-9-17

API 43047400270000 · Uintah County, Utah · 8 MILE FLAT NORTH field

POW
API
43047400270000
Operator
Scout Energy Management, LLC
County
Uintah
Measured depth
5,845 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
2,316 bbl
Cumulative gas
5,444 MCF
Cumulative water
3,979 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202611932940327
May 2026864225922
Apr 202613034437630
Mar 20261467134531
Feb 202612534618928
Jan 202613937228731
Dec 20251496922431
Nov 20251207019530
Oct 202513438916431
Sep 202513935515730
Aug 202513235515731
Jul 202513735218131
Jun 202513737320830
May 202514049922931
Apr 202513249617630
Mar 202514249015931
Feb 2025763810016
Jan 202513345417029

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2010-04-25
Completed
2010-05-15
First production
2010-05-17
Measured depth
5,920 ft
True vertical depth
5,790 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-05-316106———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.040032, -109.967526

40.04003, -109.96753 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.