NBU 1022-32B3S

API 43047402060000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047402060000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
8,835 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
360 bbl
Cumulative gas
26,933 MCF
Cumulative water
4,371 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026161,75423228
May 2026151,28717921
Apr 2026261,65931730
Mar 2026261,84638431
Feb 2026231,69533928
Jan 2026271,93837531
Dec 2025121,26218915
Nov 20257230799
Oct 2025211,63026131
Sep 2025141,56124829
Aug 2025151,44722629
Jul 2025181,37323127
Jun 2025191,60424030
May 2025211,58722930
Apr 2025191,33218224
Mar 2025271,60822631
Feb 2025251,47620628
Jan 2025291,64422831

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Spudded
2009-06-12
Completed
2010-01-27
First production
2010-01-27
Measured depth
8,850 ft
True vertical depth
8,581 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-02-0301,756240——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.912013, -109.465257

39.91201, -109.46526 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.