Ute Tribal 15A-35-4-1E (Rig Skid)
API 43047403330000 · Uintah County, Utah · LELAND BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 23 | 165 | 89 | 31 |
| Apr 2026 | 91 | 160 | 3 | 30 |
| Mar 2026 | 92 | 163 | 2 | 31 |
| Feb 2026 | 57 | 128 | 21 | 28 |
| Jan 2026 | 49 | 158 | 38 | 31 |
| Dec 2025 | 38 | 154 | 147 | 31 |
| Nov 2025 | 83 | 148 | 0 | 30 |
| Oct 2025 | 77 | 155 | 22 | 31 |
| Sep 2025 | 91 | 127 | 0 | 30 |
| Aug 2025 | 199 | 129 | 0 | 31 |
| Jul 2025 | 87 | 139 | 18 | 31 |
| Jun 2025 | 86 | 144 | 1 | 30 |
| May 2025 | 74 | 144 | 19 | 18 |
| Apr 2025 | 101 | 118 | 0 | 30 |
| Mar 2025 | 75 | 92 | 17 | 31 |
| Feb 2025 | 68 | 126 | 0 | 28 |
| Jan 2025 | 84 | 125 | 33 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-01-31 | 32 | 0 | 25 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.086467, -109.846268
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.