NBU 920-12K
API 43047501240000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 6 | 2,588 | 72 | 30 |
| May 2026 | 8 | 2,698 | 73 | 31 |
| Apr 2026 | 10 | 2,606 | 92 | 30 |
| Mar 2026 | 10 | 2,704 | 112 | 31 |
| Feb 2026 | 9 | 2,435 | 99 | 28 |
| Jan 2026 | 10 | 2,632 | 109 | 31 |
| Dec 2025 | 9 | 2,772 | 80 | 31 |
| Nov 2025 | 9 | 2,737 | 74 | 30 |
| Oct 2025 | 8 | 2,861 | 76 | 31 |
| Sep 2025 | 6 | 2,818 | 75 | 30 |
| Aug 2025 | 6 | 2,910 | 71 | 31 |
| Jul 2025 | 7 | 3,015 | 77 | 31 |
| Jun 2025 | 7 | 3,018 | 70 | 30 |
| May 2025 | 8 | 3,273 | 69 | 31 |
| Apr 2025 | 10 | 3,557 | 67 | 30 |
| Mar 2025 | 9 | 3,420 | 58 | 27 |
| Feb 2025 | 1 | 408 | 8 | 4 |
| Jan 2025 | 0 | 0 | 0 | 0 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-05-05 | 0 | 1,768 | 307 | — | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.047945, -109.616893
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.