NBU 920-15I

API 43047505750000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047505750000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
10,700 ft
True vertical depth
10,700 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
50 bbl
Cumulative gas
75,840 MCF
Cumulative water
1,816 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202623,8289330
May 202633,7379431
Apr 202633,65811830
Mar 202633,54514131
Feb 202633,52914128
Jan 202633,95713831
Dec 202534,07910131
Nov 202534,1309530
Oct 202533,9189831
Sep 202524,0869630
Aug 202524,2009131
Jul 202524,3649931
Jun 202524,2119030
May 202534,5248831
Apr 202534,5458630
Mar 202535,0228531
Feb 202534,8347728
Jan 202545,6738531

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Spudded
2010-02-26
Completed
2011-01-18
First production
2011-01-18
Measured depth
10,790 ft
True vertical depth
10,788 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-01-2001,924235——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.033671, -109.645626

40.03367, -109.64563 · Surface location as filed with Utah

Every well in Uintah County, Utah