NBU 1022-8C1CS

API 43047506430000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047506430000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,494 ft
True vertical depth
9,100 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
249 bbl
Cumulative gas
79,806 MCF
Cumulative water
5,371 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202614,19123030
May 202614,35023131
Apr 202624,24129130
Mar 202614,42334931
Feb 202614,01332328
Jan 202624,45634631
Dec 202514,53125531
Nov 202514,35923430
Oct 202514,55824131
Sep 202514,43323730
Aug 202514,44022531
Jul 202514,56524531
Jun 202514,47922230
May 202514,66721831
Apr 202514,48021330
Mar 2025784,69051731
Feb 2025704,33247228
Jan 2025844,59852231

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Completed
2012-06-13
First production
2012-06-13
Measured depth
10,434 ft
True vertical depth
10,209 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-06-1503,3290——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.968014, -109.460434

39.96801, -109.46043 · Surface location as filed with Utah

Every well in Uintah County, Utah