NBU 922-30E2AS

API 43047506560000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047506560000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,633 ft
True vertical depth
9,580 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
69 bbl
Cumulative gas
34,911 MCF
Cumulative water
6,661 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202622,17531930
May 202632,22232031
Apr 202632,16340430
Mar 202632,27748431
Feb 202632,07144828
Jan 202632,27248031
Dec 202532,08335431
Nov 202531,74732430
Oct 202521,77933431
Sep 202521,68632930
Aug 202521,79431231
Jul 202521,81033931
Jun 202521,75730830
May 202521,86630231
Apr 202531,81229630
Mar 202531,94028931
Feb 2025121,73446523
Jan 2025161,72355427

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Completed
2012-06-26
First production
2012-06-26
Measured depth
10,715 ft
True vertical depth
10,669 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-07-0202,186601——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.010815, -109.488330

40.01082, -109.48833 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.