NBU 921-17G

API 43047507010000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047507010000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
10,500 ft
True vertical depth
10,500 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
213 bbl
Cumulative gas
66,942 MCF
Cumulative water
1,891 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202693,5929630
May 2026123,6929631
Apr 2026143,58012230
Mar 2026133,74514831
Feb 2026123,36014928
Jan 2026143,73614231
Dec 2025133,77511531
Nov 2025133,6339830
Oct 2025113,77710131
Sep 202583,6939930
Aug 202583,7839431
Jul 2025103,85710231
Jun 2025103,7279330
May 2025113,9009131
Apr 2025133,7698930
Mar 2025143,8788731
Feb 2025133,5358028
Jan 2025153,9108931

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Completed
2011-07-11
First production
2011-07-11
Measured depth
10,550 ft
True vertical depth
10,545 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-07-1902,464558——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.039166, -109.574229

40.03917, -109.57423 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.