NBU 922-32P3AS

API 43047507750000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047507750000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,202 ft
True vertical depth
9,035 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
14 bbl
Cumulative gas
42,604 MCF
Cumulative water
2,062 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202602,4765730
May 202602,9125731
Apr 202608704011
Mar 202602,5298631
Feb 202602,3508028
Jan 202602,6998631
Dec 202502,8036331
Nov 202502,7435830
Oct 202502,8146031
Sep 202502,7905930
Aug 202502,9015631
Jul 202503,0716131
Jun 202503,0635530
May 202501,7043118
Apr 202501,4535129
Mar 202551,72139831
Feb 202541,68336328
Jan 202552,02240131

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Spudded
2010-08-19
Completed
2011-01-07
First production
2011-01-07
Measured depth
10,540 ft
True vertical depth
10,260 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-01-1503,529720——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.987517, -109.462959

39.98752, -109.46296 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.