NBU 921-26J3DS

API 43047508840000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047508840000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,772 ft
True vertical depth
9,765 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
385 bbl
Cumulative gas
31,598 MCF
Cumulative water
1,473 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026161,6607830
May 2026221,7367831
Apr 2026261,6839930
Mar 2026251,76811931
Feb 2026231,61710928
Jan 2026261,84911631
Dec 2025241,6168430
Nov 2025241,7097930
Oct 2025201,8168131
Sep 2025141,7188030
Aug 2025151,8057631
Jul 2025191,9388231
Jun 2025191,6027530
May 2025201,9047231
Apr 2025241,8847130
Mar 2025181,6274621
Feb 2025231,7786127
Jan 2025271,8886730

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Completed
2010-08-13
First production
2010-08-13
Measured depth
9,808 ft
True vertical depth
9,798 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-08-27372,63987——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.003643, -109.516135

40.00364, -109.51614 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.