NBU 921-26K2AS
API 43047509360000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 3 | 1,372 | 96 | 30 |
| May 2026 | 4 | 1,423 | 96 | 31 |
| Apr 2026 | 5 | 1,333 | 122 | 30 |
| Mar 2026 | 4 | 1,363 | 147 | 31 |
| Feb 2026 | 4 | 1,284 | 135 | 28 |
| Jan 2026 | 5 | 1,407 | 143 | 31 |
| Dec 2025 | 4 | 1,416 | 106 | 31 |
| Nov 2025 | 4 | 1,363 | 97 | 30 |
| Oct 2025 | 4 | 1,413 | 100 | 31 |
| Sep 2025 | 3 | 1,345 | 99 | 30 |
| Aug 2025 | 3 | 1,271 | 94 | 31 |
| Jul 2025 | 3 | 1,362 | 102 | 31 |
| Jun 2025 | 3 | 1,284 | 93 | 30 |
| May 2025 | 4 | 1,318 | 91 | 31 |
| Apr 2025 | 4 | 1,622 | 89 | 30 |
| Mar 2025 | 5 | 1,633 | 87 | 31 |
| Feb 2025 | 4 | 1,489 | 79 | 28 |
| Jan 2025 | 5 | 1,632 | 88 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-12-20 | 0 | 2,329 | 600 | — | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.005187, -109.521350
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.