NBU 922-31A1AS

API 43047509730000 · Uintah County, Utah · NATURAL BUTTES field

PGW
API
43047509730000
Operator
KODA GNB, LLC
County
Uintah
Measured depth
9,485 ft
True vertical depth
9,382 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
185 bbl
Cumulative gas
30,676 MCF
Cumulative water
1,958 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202661,7139026
May 202691,3288126
Apr 2026121,75813030
Mar 2026121,81715631
Feb 2026111,67414428
Jan 2026121,86015431
Dec 2025111,71811431
Nov 2025111,66810430
Oct 2025101,72510731
Sep 202571,73610630
Aug 202571,68010031
Jul 202591,77410931
Jun 202591,7339930
May 2025101,7599731
Apr 2025121,6929530
Mar 2025131,7389331
Feb 2025111,5708528
Jan 2025131,7339431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPGW
Completed
2010-12-11
First production
2010-12-11
Measured depth
9,507 ft
True vertical depth
9,397 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-12-1702,248360——20

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.997487, -109.474309

39.99749, -109.47431 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.