Ute Tribal 15-2-4-1E

API 43047513060000 · Uintah County, Utah · LELAND BENCH field

POW
API
43047513060000
Operator
FourPoint Resources, LLC
County
Uintah
Measured depth
7,800 ft
True vertical depth
7,800 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
2,789 bbl
Cumulative gas
1,931 MCF
Cumulative water
5,451 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202612111437629
Apr 20261208739325
Mar 202613010930831
Feb 20261237725928
Jan 20261379732431
Dec 20251488029931
Nov 202513110230530
Oct 202513710733131
Sep 202515910630030
Aug 202515611034131
Jul 202518412533731
Jun 202514810934030
May 202515611841131
Apr 2025251224030
Mar 202521012336331
Feb 202511810447828
Jan 202536013928631

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2011-04-06
Completed
2011-04-26
First production
2011-04-26
Measured depth
7,810 ft
True vertical depth
7,810 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-05-063312116———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.158698, -109.847583

40.15870, -109.84758 · Surface location as filed with Utah