NBU 922-36K4BS
API 43047515920000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 2 | 1,514 | 91 | 30 |
| May 2026 | 3 | 1,562 | 92 | 31 |
| Apr 2026 | 3 | 1,304 | 105 | 26 |
| Mar 2026 | 3 | 1,545 | 138 | 31 |
| Feb 2026 | 3 | 1,400 | 121 | 28 |
| Jan 2026 | 3 | 1,555 | 136 | 31 |
| Dec 2025 | 3 | 1,554 | 101 | 31 |
| Nov 2025 | 3 | 1,521 | 93 | 30 |
| Oct 2025 | 2 | 1,587 | 95 | 31 |
| Sep 2025 | 2 | 1,515 | 94 | 30 |
| Aug 2025 | 2 | 1,567 | 89 | 31 |
| Jul 2025 | 2 | 1,576 | 97 | 31 |
| Jun 2025 | 2 | 1,541 | 88 | 30 |
| May 2025 | 20 | 1,590 | 137 | 31 |
| Apr 2025 | 24 | 1,552 | 134 | 30 |
| Mar 2025 | 26 | 1,614 | 131 | 31 |
| Feb 2025 | 23 | 1,470 | 120 | 28 |
| Jan 2025 | 28 | 1,633 | 132 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-03-10 | 0 | 2,261 | 587 | — | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.990209, -109.390538
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.