GMBU W-24-8-17

API 43047516420000 · Uintah County, Utah · MONUMENT BUTTE field

POW
API
43047516420000
Operator
Scout Energy Management, LLC
County
Uintah
Measured depth
6,700 ft
True vertical depth
6,700 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
3,238 bbl
Cumulative gas
1,426 MCF
Cumulative water
1,615 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20262421232430
May 2026207182731
Apr 2026181160930
Mar 20262841351031
Feb 2026200291028
Jan 2026249271422
Dec 2025150301324
Nov 2025116311114
Oct 20251632317
Sep 202516931930
Aug 2025196321431
Jul 2025156281131
Jun 2025168181230
May 202516910322629
Apr 20251808326630
Mar 20251578429531
Feb 20251469121728
Jan 202525220746431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2012-02-29
Completed
2012-04-06
First production
2012-04-06
Measured depth
6,700 ft
True vertical depth
6,558 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-04-161053143———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.094141, -109.957289

40.09414, -109.95729 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.