GMBU W-2-9-17

API 43047516650000 · Uintah County, Utah · MONUMENT BUTTE field

POW
API
43047516650000
Operator
Scout Energy Management, LLC
County
Uintah
Measured depth
6,164 ft
True vertical depth
6,100 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
1,745 bbl
Cumulative gas
1,598 MCF
Cumulative water
2,743 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026879420430
May 20269611218831
Apr 2026938815329
Mar 202610113715531
Feb 2026909312228
Jan 20261008715231
Dec 20251038917931
Nov 2025958514230
Oct 20251009118431
Sep 20251089416430
Aug 202512210819131
Jul 2025949619229
Jun 202554475015
May 20251079717031
Apr 20251079116130
Mar 202581637621
Feb 2025835712525
Jan 20251246913531

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2011-09-25
Completed
2011-10-21
First production
2011-10-23
Measured depth
6,050 ft
True vertical depth
5,986 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-11-03353511———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.054393, -109.971589

40.05439, -109.97159 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.