Ute Tribal 3-9-4-1E

API 43047520210000 · Uintah County, Utah · LELAND BENCH field

POW
API
43047520210000
Operator
FourPoint Resources, LLC
County
Uintah
Measured depth
8,355 ft
True vertical depth
8,355 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
4,083 bbl
Cumulative gas
17,696 MCF
Cumulative water
6,607 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20262441,06933331
Apr 20262631,06030230
Mar 20262621,13049231
Feb 20262341,08532228
Jan 20263561,72047031
Dec 2025651,14417115
Nov 20252771,11140230
Oct 20252501,12245231
Sep 20252771,15194730
Aug 20253401,26857527
Jul 202536772581130
Jun 202510153047
May 202545358435
Apr 2025271910030
Mar 20252481,37646631
Feb 202519590321227
Jan 20252881,55930530

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
2013-11-22
First production
2013-11-22
Measured depth
8,110 ft
True vertical depth
8,108 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-12-0214179165———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.154954, -109.890349

40.15495, -109.89035 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.