Ute Tribal 13-9-4-1E
API 43047520380000 · Uintah County, Utah · LELAND BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 240 | 2,253 | 18 | 21 |
| Apr 2026 | 373 | 2,305 | 46 | 30 |
| Mar 2026 | 412 | 2,386 | 26 | 31 |
| Feb 2026 | 331 | 2,146 | 42 | 28 |
| Jan 2026 | 412 | 2,379 | 38 | 31 |
| Dec 2025 | 405 | 2,362 | 45 | 31 |
| Nov 2025 | 389 | 2,224 | 50 | 30 |
| Oct 2025 | 397 | 2,268 | 70 | 31 |
| Sep 2025 | 461 | 2,238 | 86 | 30 |
| Aug 2025 | 431 | 2,129 | 100 | 29 |
| Jul 2025 | 560 | 1,619 | 577 | 26 |
| Jun 2025 | 59 | 105 | 468 | 7 |
| May 2025 | 23 | 147 | 0 | 1 |
| Apr 2025 | 1,024 | 7,612 | 97 | 18 |
| Mar 2025 | 119 | 427 | 225 | 4 |
| Feb 2025 | 680 | 2,451 | 40 | 27 |
| Jan 2025 | 484 | 2,791 | 23 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-05-03 | 133 | 78 | 77 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.144097, -109.894987
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.