Three Rivers 16-43-820
API 43047520570000 · Uintah County, Utah · THREE RIVERS field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 188 | 538 | 169 | 31 |
| Apr 2026 | 178 | 533 | 167 | 30 |
| Mar 2026 | 179 | 544 | 188 | 31 |
| Feb 2026 | 168 | 484 | 173 | 28 |
| Jan 2026 | 189 | 610 | 156 | 31 |
| Dec 2025 | 179 | 600 | 168 | 31 |
| Nov 2025 | 187 | 522 | 136 | 30 |
| Oct 2025 | 215 | 553 | 172 | 31 |
| Sep 2025 | 210 | 511 | 176 | 30 |
| Aug 2025 | 179 | 507 | 175 | 31 |
| Jul 2025 | 124 | 507 | 291 | 31 |
| Jun 2025 | 137 | 489 | 198 | 30 |
| May 2025 | 147 | 513 | 161 | 31 |
| Apr 2025 | 193 | 505 | 182 | 30 |
| Mar 2025 | 226 | 516 | 150 | 31 |
| Feb 2025 | 214 | 501 | 102 | 28 |
| Jan 2025 | 228 | 570 | 134 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-10-20 | 156 | 381 | 87 | 31.5 | — | 47 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.121039, -109.666262
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.