Dillman 5-2-3-1W

API 43047522440000 · Uintah County, Utah · NORTH MYTON BENCH field

POW
API
43047522440000
Operator
FourPoint Resources, LLC
County
Uintah
Measured depth
10,600 ft
True vertical depth
10,600 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
7,537 bbl
Cumulative gas
4,514 MCF
Cumulative water
4,587 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202631914828731
Apr 202632117529530
Mar 202636919128531
Feb 202631416329928
Jan 202642328024631
Dec 202553426339031
Nov 202539116034412
Oct 20255453785
Sep 202546028129930
Aug 202558033233031
Jul 202586644632931
Jun 20253812201665
May 20250000
Apr 2025803926730
Mar 202575142017231
Feb 202582156823128
Jan 202587377556931

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2012-04-30
Completed
2012-06-12
First production
2012-06-12
Measured depth
10,345 ft
True vertical depth
10,345 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-06-22300222213———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.252870, -109.970730

40.25287, -109.97073 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.