Ute 13-12A-4-1

API 43047526480000 · Uintah County, Utah · LELAND BENCH field

PAOWPlugged 2026-04-01
API
43047526480000
Operator
Finley Resources, Inc
County
Uintah
Plugged
2026-04-01
Measured depth
8,500 ft
True vertical depth
8,500 ft

Production

15 monthly filings with Utah, Jan 2025 to Mar 2026. Each product is in its own unit and the four are never added.

Cumulative oil
1,919 bbl
Cumulative gas
10,370 MCF
Cumulative water
2,511 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Mar 2026334613931
Feb 20262216028
Jan 20265374031
Dec 20252416031
Nov 20251181,17912930
Oct 202518084622031
Sep 202517481421630
Aug 202517586922328
Jul 202513946221331
Jun 202526286720630
May 202515790030031
Apr 202518129017530
Mar 202518092722931
Feb 202515288422128
Jan 202518998024031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2013-09-02
Completed
2013-10-28
First production
2013-11-08
Measured depth
7,790 ft
True vertical depth
7,790 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-11-0825017337—64

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

PLUG

PAOW

Location

40.134429, -109.838755

40.13443, -109.83876 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.