FD 14-25D-2-1

API 43047528670000 · Uintah County, Utah · MOFFAT CANAL field

POW
API
43047528670000
Operator
Finley Resources, Inc
County
Uintah
Measured depth
8,851 ft
True vertical depth
8,816 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
7,345 bbl
Cumulative gas
2,356 MCF
Cumulative water
12,279 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202644715681231
Apr 20264139576430
Mar 202649911484431
Feb 20264148072427
Jan 202637514886031
Dec 202542719479130
Nov 202539214356330
Oct 202544418064230
Sep 202543119766030
Aug 202541916067731
Jul 202569113275031
Jun 202517413469530
May 202546013773531
Apr 202544011069829
Mar 202546115466231
Feb 202541310063828
Jan 202544512276431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2013-07-22
Completed
2013-08-24
First production
2013-08-24
Measured depth
9,363 ft
True vertical depth
9,339 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-08-273531103252—16

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.273858, -109.831904

40.27386, -109.83190 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.