Ute 25-3A-4-1

API 43047535390000 · Uintah County, Utah · LELAND BENCH field

POW
API
43047535390000
Operator
Finley Resources, Inc
County
Uintah
Measured depth
8,000 ft
True vertical depth
8,000 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
4,991 bbl
Cumulative gas
20,874 MCF
Cumulative water
7,622 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20264597071,33131
Apr 20269544129123
Mar 2026601,4315631
Feb 2026831,6383828
Jan 2026941,75711031
Dec 2025821,37034030
Nov 20251381,11628030
Oct 20251961,51947431
Sep 20252641,30936330
Aug 20253271,22736030
Jul 202558163140031
Jun 20251121,33041530
May 20254551,39645031
Apr 202536757154428
Mar 20255991,52266631
Feb 20254821,65759528
Jan 20255971,25290931

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
2014-10-21
First production
2014-10-24
Measured depth
7,247 ft
True vertical depth
7,247 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-10-2655021038—64

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.112286, -109.832678

40.11229, -109.83268 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.