Three Rivers 2-21-820
API 43047539470000 · Uintah County, Utah · THREE RIVERS field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 119 | 998 | 123 | 31 |
| Apr 2026 | 133 | 971 | 129 | 30 |
| Mar 2026 | 72 | 855 | 101 | 31 |
| Feb 2026 | 38 | 765 | 55 | 28 |
| Jan 2026 | 102 | 723 | 129 | 31 |
| Dec 2025 | 102 | 1,020 | 125 | 31 |
| Nov 2025 | 111 | 1,041 | 122 | 30 |
| Oct 2025 | 105 | 1,101 | 130 | 31 |
| Sep 2025 | 102 | 1,062 | 125 | 30 |
| Aug 2025 | 108 | 1,094 | 188 | 31 |
| Jul 2025 | 126 | 995 | 128 | 31 |
| Jun 2025 | 104 | 956 | 129 | 30 |
| May 2025 | 111 | 982 | 127 | 31 |
| Apr 2025 | 99 | 972 | 129 | 30 |
| Mar 2025 | 101 | 998 | 126 | 31 |
| Feb 2025 | 83 | 927 | 116 | 28 |
| Jan 2025 | 101 | 1,041 | 131 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-04-18 | 44 | 2 | 622 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.155586, -109.638147
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.