Deep Creek 7-22-4-2E
API 43047541820000 · Uintah County, Utah · LELAND BENCH field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 247 | 360 | 76 | 30 |
| May 2026 | 241 | 369 | 86 | 31 |
| Apr 2026 | 256 | 363 | 92 | 30 |
| Mar 2026 | 275 | 371 | 97 | 31 |
| Feb 2026 | 251 | 320 | 92 | 28 |
| Jan 2026 | 290 | 341 | 112 | 31 |
| Dec 2025 | 317 | 325 | 143 | 31 |
| Nov 2025 | 342 | 321 | 218 | 30 |
| Oct 2025 | 236 | 238 | 277 | 11 |
| Sep 2025 | 1 | 50 | 0 | 30 |
| Aug 2025 | 1 | 93 | 0 | 3 |
| Jul 2025 | 154 | 197 | 118 | 31 |
| Jun 2025 | 180 | 215 | 55 | 30 |
| May 2025 | 200 | 232 | 47 | 31 |
| Apr 2025 | 177 | 221 | 59 | 30 |
| Mar 2025 | 292 | 234 | 104 | 31 |
| Feb 2025 | 156 | 188 | 243 | 28 |
| Jan 2025 | 198 | 224 | 78 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2015-06-12 | 53 | 5 | 104 | 40 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.123992, -109.749212
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.