Three Rivers 16-14T-820
API 43047543400000 · Uintah County, Utah · THREE RIVERS field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 220 | 818 | 121 | 31 |
| Apr 2026 | 208 | 788 | 119 | 30 |
| Mar 2026 | 209 | 814 | 134 | 31 |
| Feb 2026 | 196 | 731 | 124 | 28 |
| Jan 2026 | 221 | 809 | 111 | 31 |
| Dec 2025 | 209 | 793 | 120 | 31 |
| Nov 2025 | 217 | 732 | 113 | 30 |
| Oct 2025 | 230 | 823 | 126 | 31 |
| Sep 2025 | 210 | 773 | 117 | 30 |
| Aug 2025 | 300 | 772 | 83 | 31 |
| Jul 2025 | 299 | 775 | 104 | 31 |
| Jun 2025 | 228 | 742 | 158 | 30 |
| May 2025 | 234 | 772 | 138 | 31 |
| Apr 2025 | 281 | 751 | 144 | 30 |
| Mar 2025 | 292 | 768 | 168 | 31 |
| Feb 2025 | 249 | 733 | 162 | 28 |
| Jan 2025 | 291 | 889 | 184 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-07-11 | 277 | 103 | 266 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.122264, -109.678830
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.