Three Rivers 16-24T-820
API 43047543410000 · Uintah County, Utah · THREE RIVERS field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 158 | 715 | 121 | 31 |
| Apr 2026 | 148 | 703 | 119 | 30 |
| Mar 2026 | 150 | 722 | 134 | 31 |
| Feb 2026 | 139 | 648 | 124 | 28 |
| Jan 2026 | 159 | 720 | 97 | 31 |
| Dec 2025 | 148 | 706 | 96 | 31 |
| Nov 2025 | 156 | 654 | 90 | 30 |
| Oct 2025 | 179 | 735 | 128 | 31 |
| Sep 2025 | 175 | 686 | 147 | 30 |
| Aug 2025 | 226 | 682 | 114 | 31 |
| Jul 2025 | 254 | 682 | 111 | 31 |
| Jun 2025 | 256 | 658 | 79 | 30 |
| May 2025 | 155 | 685 | 69 | 31 |
| Apr 2025 | 167 | 673 | 99 | 30 |
| Mar 2025 | 249 | 683 | 149 | 31 |
| Feb 2025 | 221 | 655 | 162 | 28 |
| Jan 2025 | 236 | 775 | 206 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-07-11 | 179 | 67 | 359 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
CONVERT
Location
40.122050, -109.678987
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.