Three Rivers Fed 3-22T-820
API 43047544930000 · Uintah County, Utah · THREE RIVERS field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 114 | 551 | 274 | 31 |
| Apr 2026 | 109 | 535 | 278 | 30 |
| Mar 2026 | 107 | 554 | 285 | 31 |
| Feb 2026 | 97 | 501 | 93 | 28 |
| Jan 2026 | 114 | 573 | 101 | 31 |
| Dec 2025 | 135 | 556 | 100 | 31 |
| Nov 2025 | 107 | 550 | 302 | 30 |
| Oct 2025 | 93 | 582 | 478 | 31 |
| Sep 2025 | 101 | 551 | 418 | 30 |
| Aug 2025 | 84 | 559 | 550 | 31 |
| Jul 2025 | 110 | 568 | 172 | 31 |
| Jun 2025 | 124 | 561 | 422 | 30 |
| May 2025 | 115 | 570 | 285 | 31 |
| Apr 2025 | 120 | 554 | 294 | 30 |
| Mar 2025 | 134 | 625 | 196 | 31 |
| Feb 2025 | 144 | 723 | 66 | 28 |
| Jan 2025 | 161 | 753 | 145 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-12-18 | 135 | 224 | 63 | 31.98 | — | 64 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.153257, -109.655440
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.