Young 3-36A1

API 43047547340000 · Uintah County, Utah · BLUEBELL field

POW
API
43047547340000
Operator
Crescent Energy Operating, LLC
County
Uintah
Measured depth
14,210 ft
True vertical depth
14,200 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
6,101 bbl
Cumulative gas
14,119 MCF
Cumulative water
27,671 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20263,3631,91620,34819
May 20260000
Apr 20260000
Mar 2026155473031
Feb 20260356028
Jan 20260484031
Dec 20250646031
Nov 20250639030
Oct 20250616031
Sep 20250541030
Aug 20250547031
Jul 20250575031
Jun 20250599030
May 20255775723031
Apr 20255731,5141,73230
Mar 20256301,6471,88431
Feb 20256011,4881,54428
Jan 20257221,3211,93331

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Completed
2016-08-31
First production
2016-09-01
Measured depth
13,587 ft
True vertical depth
13,544 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2016-09-118871,28950750—16

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW

Location

40.347859, -109.953345

40.34786, -109.95334 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.