Murray 3-22A1E
API 43047554830000 · Uintah County, Utah · BLUEBELL field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 533 | 452 | 371 | 30 |
| May 2026 | 534 | 514 | 296 | 29 |
| Apr 2026 | 692 | 490 | 320 | 30 |
| Mar 2026 | 623 | 567 | 330 | 31 |
| Feb 2026 | 555 | 506 | 308 | 28 |
| Jan 2026 | 625 | 549 | 376 | 31 |
| Dec 2025 | 637 | 587 | 396 | 31 |
| Nov 2025 | 593 | 563 | 361 | 30 |
| Oct 2025 | 653 | 641 | 361 | 31 |
| Sep 2025 | 646 | 648 | 360 | 30 |
| Aug 2025 | 702 | 664 | 404 | 31 |
| Jul 2025 | 668 | 679 | 376 | 31 |
| Jun 2025 | 650 | 658 | 358 | 30 |
| May 2025 | 696 | 597 | 377 | 31 |
| Apr 2025 | 693 | 678 | 354 | 30 |
| Mar 2025 | 703 | 588 | 342 | 31 |
| Feb 2025 | 633 | 500 | 312 | 28 |
| Jan 2025 | 818 | 595 | 346 | 30 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2016-12-17 | 372 | 336 | 411 | — | — | 14 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWLocation
40.378486, -109.864143
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.