Black Bear 1-9A-5-2
API 43047555510000 · Uintah County, Utah · LELAND BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 20 | 1,040 | 420 | 30 |
| Apr 2026 | 308 | 1,887 | 227 | 30 |
| Mar 2026 | 424 | 1,824 | 364 | 30 |
| Feb 2026 | 63 | 342 | 177 | 28 |
| Jan 2026 | 305 | 1,766 | 229 | 31 |
| Dec 2025 | 284 | 1,641 | 486 | 31 |
| Nov 2025 | 234 | 1,865 | 304 | 30 |
| Oct 2025 | 420 | 3,253 | 254 | 31 |
| Sep 2025 | 441 | 3,216 | 262 | 30 |
| Aug 2025 | 466 | 3,298 | 279 | 31 |
| Jul 2025 | 525 | 2,339 | 303 | 31 |
| Jun 2025 | 574 | 2,267 | 504 | 30 |
| May 2025 | 241 | 1,370 | 292 | 31 |
| Apr 2025 | 165 | 506 | 417 | 30 |
| Mar 2025 | 375 | 1,455 | 272 | 31 |
| Feb 2025 | 447 | 2,489 | 293 | 28 |
| Jan 2025 | 630 | 2,254 | 294 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-04-07 | 32 | 15 | 773 | 38 | — | 64 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.076378, -109.710608
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.