BRISCOE RANCH

Operated by ROSETTA RESOURCES OPERATING LP (P-5 728883) in the CATARINA, SW. (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206695District 01Field 163405002 tax incentive programmesCondensateGasSaveExport
Value, all time
$334 k
Jan 2005 – Mar 2019
Value, last 12 filed months
$0
at the published price for each month
Months reported
171
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 213 leases and 214 wells, and the rule below applies to all of them.

Discovered
1973-12-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: OPTIONAL 80 ACRE UNIT MAX DIAG 4000

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-18161371
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition29 bbl$1,427
GasProduction50,449 Mcf$332,708
Total$334,135

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2393, -99.8112. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.23929, -99.81122 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,200 ft
1 wells filed one
Completion to plug
14.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,200 ft.

Completions filed
Jan 2005
1 of 1 wells
Plug dates filed
Mar 2019
1 of 1 wells

Last completion to plug: a median of 14.2 years across the 1 well that filed both dates, with the middle half between 14.2 years and 14.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-12733255395,200 ftJan 2005Mar 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (171)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

171 months

Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201617026.472.06$450
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 2014010190.404.86$491
Dec 2013028591.824.35$1,241
Nov 2013022288.853.74$830
Oct 201305697.423.78$212
Sep 20130316104.113.72$1,175
Aug 20130383104.253.52$1,349
Jul 20130489102.523.72$1,818
Jun 2013036894.403.93$1,447
May 2013034894.834.15$1,444
Apr 2013018393.964.28$784
Mar 2013025393.623.91$990
Feb 2013021991.233.42$749
Jan 2013029491.603.42$1,005
Dec 2012020986.773.42$715
Nov 2012037586.953.62$1,359
Oct 2012027589.383.40$935
Sep 2012017894.672.92$519
Aug 2012026592.662.91$771
Jul 2012028885.133.02$870
Jun 2012728179.822.52$1,267
May 2012028991.612.49$719
Apr 20120314101.652.00$627
Mar 20120325105.052.22$722
Feb 20120293101.102.57$753
Jan 2012039898.092.73$1,088
Dec 2011036696.873.24$1,186
Nov 201106495.723.31$212
Oct 2011016984.983.65$617
Sep 2011532683.623.99$1,717
Aug 2011031183.404.15$1,290
Jul 2011016794.144.52$754
Jun 2011016792.904.64$775
May 2011025098.134.40$1,101
Apr 20110186105.964.33$806
Mar 2011023496.364.06$949
Feb 2011016985.644.18$706
Jan 2011028786.504.59$1,317
Dec 2010024885.734.35$1,078
Nov 2010029080.843.80$1,101
Oct 2010023678.103.51$828
Sep 2010017572.633.98$696
Aug 2010011873.684.42$521
Jul 2010015072.554.74$710
Jun 2010025870.364.91$1,267
May 2010035471.124.24$1,499
Apr 2010036681.694.12$1,509
Mar 2010031578.394.39$1,382
Feb 2010024873.585.44$1,350
Jan 2010019474.365.96$1,157
Dec 2009030971.445.48$1,694
Nov 2009050274.593.75$1,883
Oct 2009058072.544.11$2,384
Sep 2009033865.543.06$1,036
Aug 2009033267.423.22$1,069
Jul 2009050761.133.46$1,757
Jun 2009031766.163.90$1,235
May 2009033154.743.93$1,299
Apr 2009031946.773.59$1,144
Mar 2009032742.144.06$1,327
Feb 2009027932.814.63$1,293
Jan 2009034835.865.37$1,869
Dec 2008032137.105.98$1,919
Nov 2008026355.496.86$1,804
Oct 2008035775.246.92$2,471
Sep 20080358101.767.88$2,820
Aug 20080340114.228.48$2,884
Jul 20080365131.0811.39$4,157
Jun 20080384131.3313.03$5,005
May 20080407123.1711.57$4,711
Apr 20080459110.3110.45$4,799
Mar 20080452101.909.66$4,368
Feb 2008041092.538.77$3,596
Jan 2008049890.388.21$4,086
Dec 2007048288.337.30$3,520
Nov 2007052191.677.29$3,799
Oct 2007056782.856.92$3,925
Sep 2007051875.846.24$3,234
Aug 2007069769.066.39$4,452
Jul 2007074670.906.39$4,765
Jun 2007071762.007.55$5,412
May 2007066658.747.85$5,226
Apr 2007058859.617.81$4,589
Mar 2007058856.927.30$4,294
Feb 2007054355.108.22$4,461
Jan 2007054850.306.73$3,686
Dec 2006061356.656.92$4,241
Nov 2006059254.207.62$4,510
Oct 2006064854.906.01$3,897
Sep 2006064860.085.04$3,264
Aug 2006071968.717.34$5,277
Jul 2006068969.376.34$4,370
Jun 2006069966.286.38$4,462
May 2006068566.016.42$4,401
Apr 2006076864.397.36$5,653
Mar 2006075256.707.08$5,326
Feb 2006077257.597.75$5,984
Jan 2006089260.598.93$7,969
Dec 2005090954.9413.42$12,195
Nov 2005093354.6910.59$9,879
Oct 200501,06858.3413.80$14,734
Sep 2005081661.4512.08$9,856
Aug 2005083661.519.80$8,190
Jul 200501,23655.697.84$9,695
Jun 200501,45252.337.38$10,717
May 200501,44545.226.65$9,611
Apr 2005060149.207.36$4,424
Mar 200501,23650.377.15$8,843
Feb 200501,01545.226.31$6,407
Jan 200501,48643.166.32$9,395

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2016 — as filed, then multipliedworked
Condensate            17 bbl  × $ 26.47 =       $450
Gas                    0 Mcf  × $  2.06 =         $0

────────────────────────────────────────────────────
Month total                                     $450

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/206695 is the state's own key, not one this site invented.