Operated by ROSETTA RESOURCES OPERATING LP (P-5 728883) in the CATARINA, SW. (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 66319District 01Field 16340500CondensateGasSaveExport
Value, all time
$79 k
Jan 1993 – Apr 2016
Value, last 12 filed months
$26
at the published price for each month
Months reported
280
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 213 leases and 214 wells, and the rule below applies to all of them.

Discovered
1973-12-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: OPTIONAL 80 ACRE UNIT MAX DIAG 4000

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11 bbl$328
GasProduction38,572 Mcf$78,238
Total$78,566

20,438 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2576, -99.7801. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.25763, -99.78007 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,214 ft
1 wells filed one
Completion to plug
38.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,214 ft.

Completions filed
Mar 1976
1 of 1 wells
Plug dates filed
Feb 2015
1 of 1 wells

Last completion to plug: a median of 38.9 years across the 1 well that filed both dates, with the middle half between 38.9 years and 38.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-12731022135,214 ftMar 1976Feb 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (280)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

280 months

Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20161026.472.06$26
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20121079.822.52$80
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 20120106101.102.57$272
Jan 201203998.092.73$107
Dec 201109396.873.24$301
Nov 20110995.723.31$30
Oct 201109984.983.65$361
Sep 201119483.623.99$458
Aug 2011011083.404.15$456
Jul 201104794.144.52$212
Jun 201106492.904.64$297
May 201107998.134.40$348
Apr 2011054105.964.33$234
Mar 201102896.364.06$114
Feb 2011014085.644.18$585
Jan 20110986.504.59$41
Dec 20100885.734.35$35
Nov 201006780.843.80$254
Oct 201008778.103.51$305
Sep 201003572.633.98$139
Aug 201003273.684.42$141
Jul 201005272.554.74$246
Jun 201003270.364.91$157
May 201002871.124.24$119
Apr 201002881.694.12$115
Mar 201002478.394.39$105
Feb 201001773.585.44$93
Jan 201001374.365.96$78
Dec 200902171.445.48$115
Nov 200902374.593.75$86
Oct 200902672.544.11$107
Sep 200907265.543.06$221
Aug 200906967.423.22$222
Jul 2009013661.133.46$471
Jun 200906166.163.90$238
May 200907154.743.93$279
Apr 2009010846.773.59$387
Mar 2009013042.144.06$528
Feb 200907732.814.63$357
Jan 2009013835.865.37$741
Dec 200808437.105.98$502
Nov 2008010055.496.86$686
Oct 2008010875.246.92$748
Sep 20080115101.767.88$906
Aug 20080106114.228.48$899
Jul 20080103131.0811.39$1,173
Jun 20080114131.3313.03$1,486
May 2008061123.1711.57$706
Apr 2008067110.3110.45$700
Mar 2008077101.909.66$744
Feb 200805092.538.77$439
Jan 200803890.388.21$312
Dec 200707388.337.30$533
Nov 200705691.677.29$408
Oct 200703882.856.92$263
Sep 200701175.846.24$69
Aug 200705369.066.39$339
Jul 200702870.906.39$179
Jun 200702662.007.55$196
May 200702558.747.85$196
Apr 200703859.617.81$297
Mar 200706656.927.30$482
Feb 200706855.108.22$559
Jan 200708450.306.73$565
Dec 200603856.656.92$263
Nov 200602654.207.62$198
Oct 200601454.906.01$84
Sep 200602760.085.04$136
Aug 200601468.717.34$103
Jul 200602969.376.34$184
Jun 200602766.286.38$172
May 200608266.016.42$527
Apr 20060064.397.36$0
Mar 200601356.707.08$92
Feb 200606757.597.75$519
Jan 200606460.598.93$572
Dec 200508354.9413.42$1,113
Nov 200505254.6910.59$551
Oct 200505058.3413.80$690
Sep 200506761.4512.08$809
Aug 200501761.519.80$167
Jul 200505155.697.84$400
Jun 200509552.337.38$701
May 200507045.226.65$466
Apr 200508949.207.36$655
Mar 200505450.377.15$386
Feb 200506745.226.31$423
Jan 2005013043.166.32$822
Dec 2004016839.866.75$1,134
Nov 2004015445.286.33$975
Oct 2004014949.706.52$971
Sep 2004013243.245.28$697
Aug 2004012642.375.55$699
Jul 2004014838.286.08$900
Jun 2004015536.106.43$997
May 200406137.486.49$396
Apr 200405134.475.86$299
Mar 200405934.365.53$326
Feb 200407432.455.51$408
Jan 200408132.036.30$510
Dec 200307430.266.30$466
Nov 200308728.804.60$400
Oct 200309528.174.76$452
Sep 200309626.314.75$456
Aug 2003010529.765.13$539
Jul 2003011129.415.17$574
Jun 200309028.565.98$538
May 200308126.595.97$484
Apr 200308426.675.41$454
Mar 200309831.146.10$597
Feb 2003010233.487.93$808
Jan 2003013030.315.58$726
Dec 2002011426.914.85$553
Nov 2002013524.664.14$558
Oct 2002017626.464.23$744
Sep 2002015127.443.64$549
Aug 2002017225.963.16$544
Jul 2002019324.583.06$591
Jun 2002017023.733.34$568
May 2002020124.663.58$720
Apr 2002019823.653.51$695
Mar 2002021222.003.10$658
Feb 2002022418.222.38$532
Jan 2002023117.172.38$549
Dec 2001023816.932.36$563
Nov 2001026818.072.41$645
Oct 2001023219.782.53$587
Sep 2001017124.262.25$385
Aug 200109024.873.05$275
Jul 200108323.933.20$265
Jun 2001012124.563.82$463
May 2001013025.524.31$560
Apr 2001010524.685.34$560
Mar 2001011824.545.38$634
Feb 200105427.755.77$311
Jan 200108327.478.40$697
Dec 2000010026.889.12$912
Nov 200006032.215.66$339
Oct 200006031.235.15$309
Sep 200006031.875.19$311
Aug 200007129.644.54$322
Jul 200007128.534.09$290
Jun 200007329.304.40$321
May 200006227.263.68$228
Apr 200005224.513.12$162
Mar 200006328.422.86$180
Feb 200005027.622.73$136
Jan 200005025.272.48$124
Dec 199907324.282.42$177
Nov 199906123.192.43$148
Oct 199906620.982.80$185
Sep 199908721.752.62$228
Aug 1999011819.262.88$339
Jul 1999013917.892.37$330
Jun 199909515.942.36$224
May 1999011315.792.32$262
Apr 199907415.102.21$163
Mar 199908412.471.84$154
Feb 19990999.981.82$180
Jan 1999014210.381.90$270
Dec 199801069.201.77$188
Nov 199807410.892.19$162
Oct 1998011712.421.97$230
Sep 1998015212.592.08$317
Aug 1998012011.301.91$229
Jul 1998012611.742.24$282
Jun 1998026811.242.24$600
May 1998018912.622.21$417
Apr 1998026813.042.51$671
Mar 1998033612.802.31$776
Feb 1998027813.952.30$639
Jan 1998030814.702.15$664
Dec 1997026016.322.41$627
Nov 1997025418.193.09$784
Oct 1997020419.253.15$643
Sep 1997021717.742.95$641
Aug 1997024717.862.55$631
Jul 1997019717.582.25$443
Jun 1997017617.242.26$397
May 1997016818.972.31$388
Apr 1997015917.882.08$331
Mar 1997017118.951.94$332
Feb 1997014920.492.21$329
Jan 1997014523.483.54$513
Dec 1996015423.32$0
Nov 1996016921.97$0
Oct 1996016723.31$0
Sep 1996024622.22$0
Aug 1996034020.26$0
Jul 1996043419.55$0
Jun 1996044218.73$0
May 1996052219.43$0
Apr 1996048021.51$0
Mar 1996033219.38$0
Feb 1996032416.98$0
Jan 1996036517.07$0
Dec 1995044617.19$0
Nov 1995038016.00$0
Oct 1995040515.43$0
Sep 1995047416.18$0
Aug 1995045215.92$0
Jul 1995044115.24$0
Jun 1995044516.41$0
May 1995043317.56$0
Apr 1995044817.73$0
Mar 1995050416.44$0
Feb 1995044216.58$0
Jan 1995035515.92$0
Dec 1994036415.03$0
Nov 1994039115.90$0
Oct 1994047415.58$0
Sep 1994046015.29$0
Aug 1994050516.13$0
Jul 1994051017.56$0
Jun 1994042717.09$0
May 1994043015.88$0
Apr 1994036514.14$0
Mar 1994042412.46$0
Feb 1994041412.50$0
Jan 1994048112.66$0
Dec 1993052112.33$0
Nov 1993046114.49$0
Oct 1993050615.85$0
Sep 1993056315.03$0
Aug 1993062515.66$0
Jul 1993046815.46$0
Jun 1993041016.79$0
May 1993148617.68$18
Apr 1993044718.05$0
Mar 1993148118.14$18
Feb 1993149617.90$18
Jan 1993552916.93$85

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2016 — as filed, then multipliedworked
Condensate             1 bbl  × $ 26.47 =        $26
Gas                    0 Mcf  × $  2.06 =         $0

────────────────────────────────────────────────────
Month total                                      $26

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/66319 is the state's own key, not one this site invented.