GATES RANCH "A"

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the CATARINA, SW. (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 74643District 01Field 16340500CondensateGasSaveExport
Value, all time
$7 k
Jan 1993 – Jan 2003
Value, last 12 filed months
$195
at the published price for each month
Months reported
121
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 213 leases and 214 wells, and the rule below applies to all of them.

Discovered
1973-12-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: OPTIONAL 80 ACRE UNIT MAX DIAG 4000

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10 bbl$164
GasProduction6,538 Mcf$7,007
Total$7,172

3,962 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.2288, -99.7976. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.22877, -99.79756 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,350 ft
1 wells filed one
Completion to plug
26.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,350 ft.

Completions filed
Feb 1976
1 of 1 wells
Plug dates filed
Jan 2003
1 of 1 wells

Last completion to plug: a median of 26.9 years across the 1 well that filed both dates, with the middle half between 26.9 years and 26.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1273094322255,350 ftFeb 1976Jan 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (121)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

121 months

Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 200208218.222.38$195
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 200009431.875.19$488
Aug 2000014229.644.54$645
Jul 200006728.534.09$274
Jun 200004929.304.40$215
May 200003427.263.68$125
Apr 200004524.513.12$140
Mar 200005228.422.86$149
Feb 200004827.622.73$131
Jan 200005025.272.48$124
Dec 199906324.282.42$153
Nov 199905523.192.43$134
Oct 199905020.982.80$140
Sep 199904221.752.62$110
Aug 199905419.262.88$155
Jul 199904217.892.37$100
Jun 199903215.942.36$76
May 199903615.792.32$84
Apr 199903815.102.21$84
Mar 199904512.471.84$83
Feb 19990429.981.82$76
Jan 199905510.381.90$105
Dec 19980409.201.77$71
Nov 199805110.892.19$111
Oct 199805412.421.97$106
Sep 199804412.592.08$92
Aug 199805611.301.91$107
Jul 199807411.742.24$166
Jun 199808111.242.24$181
May 199807112.622.21$157
Apr 199807613.042.51$190
Mar 199807112.802.31$164
Feb 199804513.952.30$103
Jan 199806714.702.15$144
Dec 199704816.322.41$116
Nov 199706818.193.09$210
Oct 199706919.253.15$217
Sep 199705417.742.95$160
Aug 199705017.862.55$128
Jul 199705117.582.25$115
Jun 199704317.242.26$97
May 199705818.972.31$134
Apr 199704217.882.08$87
Mar 199705018.951.94$97
Feb 199705220.492.21$115
Jan 199704423.483.54$156
Dec 199605823.32$0
Nov 199606221.97$0
Oct 199608523.31$0
Sep 199609722.22$0
Aug 1996011620.26$0
Jul 1996011219.55$0
Jun 199605718.73$0
May 199606419.43$0
Apr 199604421.51$0
Mar 199606319.38$0
Feb 199605616.98$0
Jan 199606917.07$0
Dec 199509517.19$0
Nov 199506116.00$0
Oct 199506815.43$0
Sep 199505916.18$0
Aug 199506515.92$0
Jul 199505015.24$0
Jun 199504916.41$0
May 199505617.56$0
Apr 199506817.73$0
Mar 1995107516.44$164
Feb 199505316.58$0
Jan 199504115.92$0
Dec 199405615.03$0
Nov 1994012415.90$0
Oct 1994012315.58$0
Sep 199409715.29$0
Aug 1994012216.13$0
Jul 199408817.56$0
Jun 199408617.09$0
May 199407815.88$0
Apr 199408014.14$0
Mar 199409112.46$0
Feb 199408812.50$0
Jan 199409912.66$0
Dec 1993010512.33$0
Nov 1993010414.49$0
Oct 1993010615.85$0
Sep 1993010915.03$0
Aug 1993010615.66$0
Jul 199308715.46$0
Jun 1993010816.79$0
May 1993010717.68$0
Apr 1993011418.05$0
Mar 199308018.14$0
Feb 199308917.90$0
Jan 199309216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2002 — as filed, then multipliedworked
Condensate             0 bbl  × $ 18.22 =         $0
Gas                   82 Mcf  × $  2.38 =       $195

────────────────────────────────────────────────────
Month total                                     $195

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 01/G/74643 is the state's own key, not one this site invented.