ANDERSON

Operated by H-M RESOURCE MANAGEMENT, INC. (P-5 341468) in the EGYPT (3800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 147065District 03Field 27807525GasSaveExport
Value, all time
$660 k
Oct 1993 – May 2001
Value, last 12 filed months
$207 k
at the published price for each month
Months reported
92
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1973-08-04
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction515,462 Mcf$660,317
Total$660,317

289,115 Mcf of this lease's gas, across 39 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4198, -96.2464. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.41976, -96.24642 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,612 ft
1 wells filed one
Completion to plug
2.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,612 ft.

Completions filed
May 2001
1 of 1 wells
Plug dates filed
Oct 2003
1 of 1 wells

Last completion to plug: a median of 2.4 years across the 1 well that filed both dates, with the middle half between 2.4 years and 2.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4813288937,612 ftMay 2001Oct 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (92)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

92 months

May 2001025.524.31$0
Apr 20011,99924.685.34$10,665
Mar 20014,34224.545.38$23,345
Feb 20014,47027.755.77$25,779
Jan 20014,27727.478.40$35,922
Dec 20003,23726.889.12$29,530
Nov 20002,18732.215.66$12,374
Oct 20002,64131.235.15$13,589
Sep 20002,76531.875.19$14,341
Aug 20003,89229.644.54$17,673
Jul 20004,86128.534.09$19,880
Jun 200094529.304.40$4,155
May 2000027.263.68$0
Apr 20003024.513.12$93
Mar 200058628.422.86$1,676
Feb 20005,20427.622.73$14,189
Jan 20004,52225.272.48$11,217
Dec 19994,44824.282.42$10,781
Nov 19994,46823.192.43$10,875
Oct 19995,23520.982.80$14,677
Sep 19995,09421.752.62$13,340
Aug 19994,66219.262.88$13,406
Jul 19994,72617.892.37$11,212
Jun 19994,83315.942.36$11,416
May 19995,13015.792.32$11,907
Apr 19994,52115.102.21$9,983
Mar 19995,39912.471.84$9,925
Feb 19994,9829.981.82$9,056
Jan 19995,45610.381.90$10,366
Dec 19985,9249.201.77$10,505
Nov 19985,48910.892.19$11,997
Oct 19983,82412.421.97$7,530
Sep 19985,08712.592.08$10,594
Aug 19982,86111.301.91$5,457
Jul 19982,27311.742.24$5,085
Jun 19983,98111.242.24$8,907
May 19985,24912.622.21$11,581
Apr 19985,50813.042.51$13,799
Mar 19985,67212.802.31$13,099
Feb 19984,20413.952.30$9,666
Jan 19986,08714.702.15$13,116
Dec 19973,23816.322.41$7,807
Nov 19973,09618.193.09$9,561
Oct 19975,47719.253.15$17,252
Sep 19976,21217.742.95$18,356
Aug 19977,69417.862.55$19,656
Jul 19975,90917.582.25$13,277
Jun 19975,13217.242.26$11,584
May 19975,24318.972.31$12,103
Apr 19974,94517.882.08$10,299
Mar 19975,38318.951.94$10,438
Feb 19976,41320.492.21$14,146
Jan 19976,53423.483.54$23,128
Dec 19966,72123.32$0
Nov 19965,42121.97$0
Oct 19965,32023.31$0
Sep 19964,61822.22$0
Aug 19964,73920.26$0
Jul 19965,32619.55$0
Jun 19966,35418.73$0
May 19966,00219.43$0
Apr 19964,41421.51$0
Mar 19962,44819.38$0
Feb 19961,50216.98$0
Jan 19966,74717.07$0
Dec 19956,24517.19$0
Nov 19957,30016.00$0
Oct 19955,80715.43$0
Sep 19954,87616.18$0
Aug 19957,11915.92$0
Jul 19955,92315.24$0
Jun 19956,13816.41$0
May 19956,23017.56$0
Apr 19956,93217.73$0
Mar 19956,48316.44$0
Feb 19956,31916.58$0
Jan 19957,29215.92$0
Dec 19946,77915.03$0
Nov 19945,84915.90$0
Oct 19945,45015.58$0
Sep 19945,09515.29$0
Aug 19947,42516.13$0
Jul 19949,98517.56$0
Jun 199410,67417.09$0
May 199412,94615.88$0
Apr 199412,45314.14$0
Mar 199414,41012.46$0
Feb 199414,01912.50$0
Jan 199414,84412.66$0
Dec 199316,77512.33$0
Nov 199313,94314.49$0
Oct 19932,19215.85$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2001 — as filed, then multipliedworked
Gas                1,999 Mcf  × $  5.34 =    $10,665

────────────────────────────────────────────────────
Month total                                  $10,665

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/147065 is the state's own key, not one this site invented.