ANDERSON

Operated by H-M RESOURCE MANAGEMENT, INC. (P-5 341468) in the NORTHINGTON (FRIO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 183643District 03Field 66112400GasSaveExport
Value, all time
$195 k
May 2001 – Oct 2003
Value, last 12 filed months
$30 k
at the published price for each month
Months reported
30
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1975-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ONE WELL FIELD EFF 5/05

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction58,966 Mcf$195,480
Total$195,480

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4198, -96.2464. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.41976, -96.24642 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,612 ft
1 wells filed one
Completion to plug
2.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,612 ft.

Completions filed
May 2001
1 of 1 wells
Plug dates filed
Oct 2003
1 of 1 wells

Last completion to plug: a median of 2.4 years across the 1 well that filed both dates, with the middle half between 2.4 years and 2.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4813288937,612 ftMay 2001Oct 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (30)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

30 months

Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 20033028.565.98$179
May 20033026.595.97$179
Apr 20033026.675.41$162
Mar 200335731.146.10$2,176
Feb 200322833.487.93$1,807
Jan 20031,66430.315.58$9,289
Dec 20023,26826.914.85$15,862
Nov 20029324.664.14$385
Oct 200230926.464.23$1,307
Sep 20022,15827.443.64$7,845
Aug 20023,16925.963.16$10,027
Jul 20021,91724.583.06$5,869
Jun 200254523.733.34$1,819
May 20021,31924.663.58$4,727
Apr 20022,34323.653.51$8,229
Mar 20022,95522.003.10$9,169
Feb 20021,66718.222.38$3,960
Jan 20022,56817.172.38$6,101
Dec 20012,49316.932.36$5,894
Nov 20013,67318.072.41$8,835
Oct 20013,39019.782.53$8,573
Sep 20014,47824.262.25$10,081
Aug 20015,53224.873.05$16,890
Jul 20014,33023.933.20$13,843
Jun 20015,40824.563.82$20,681
May 20015,01225.524.31$21,588

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2003 — as filed, then multipliedworked
Gas                   30 Mcf  × $  5.98 =       $179

────────────────────────────────────────────────────
Month total                                     $179

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/183643 is the state's own key, not one this site invented.