LOCKWOOD & SHARP -B-

Operated by DENBURY ONSHORE, LLC (P-5 215343) in the THOMPSON field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 200361District 03Field 89525001CondensateGasSaveExport
Value, all time
$4.3 M
Feb 2004 – Dec 2016
Value, last 12 filed months
$0
at the published price for each month
Months reported
155
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 94 leases and 557 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
233 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2004-03-11.

The Commission's schedule remark for this field reads: BE DESIGNATED AS THE THOMPSON FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,397 bbl$597,114
GasProduction515,539 Mcf$3,680,531
Total$4,277,645

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4534, -95.5866. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.45337, -95.58656 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,450 ft
1 wells filed one
Completion to plug
12.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,450 ft.

Completions filed
Feb 2004
1 of 1 wells
Plug dates filed
Dec 2016
1 of 1 wells

Last completion to plug: a median of 12.8 years across the 1 well that filed both dates, with the middle half between 12.8 years and 12.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-15730443585,450 ftFeb 2004Dec 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (155)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

155 months

Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20153040.162.87$120
Jul 2015115348.152.95$5,546
Jun 20150056.152.88$0
May 20151691955.212.96$9,387
Apr 20151703949.822.71$8,575
Mar 20153462942.892.93$14,925
Feb 20151744944.662.98$7,917
Jan 20153514443.433.10$15,380
Dec 20141584154.693.59$8,788
Nov 2014345670.464.25$2,634
Oct 20141054678.303.90$8,401
Sep 20141656186.164.05$14,463
Aug 2014025589.394.04$1,029
Jul 201416910196.564.18$16,741
Jun 201405798.164.74$270
May 20141714994.734.73$16,430
Apr 20141699495.944.81$16,666
Mar 20141685895.895.06$16,403
Feb 201401497.406.19$87
Jan 20145121490.404.86$46,353
Dec 20133381391.824.35$31,092
Nov 20131741388.853.74$15,509
Oct 2013167797.423.78$16,296
Sep 201317116104.113.72$17,862
Aug 201317029104.253.52$17,825
Jul 2013063102.523.72$234
Jun 20138511694.403.93$8,480
May 201316111794.834.15$15,753
Apr 201303593.964.28$150
Mar 201328411793.623.91$27,046
Feb 2013987091.233.42$9,180
Jan 201339816691.603.42$37,025
Dec 20127915386.773.42$7,378
Nov 201218110786.953.62$16,126
Oct 201213914789.383.40$12,924
Sep 2012018094.672.92$525
Aug 20126525792.662.91$6,770
Jul 20125926885.133.02$5,832
Jun 2012022679.822.52$569
May 2012028291.612.49$702
Apr 201244220101.652.00$4,912
Mar 20124190105.052.22$4,507
Feb 201281626101.102.57$9,798
Jan 20123768598.092.73$5,502
Dec 2011941,04696.873.24$12,495
Nov 20111141,19495.723.31$14,866
Oct 2011331,29884.983.65$7,540
Sep 2011351,23483.623.99$7,845
Aug 201101,12683.404.15$4,672
Jul 201101,02294.144.52$4,617
Jun 201101,26692.904.64$5,874
May 2011291,14298.134.40$7,876
Apr 20111755105.964.33$2,040
Mar 20115797596.364.06$9,448
Feb 2011371,33285.644.18$8,736
Jan 2011611,97686.504.59$14,344
Dec 2010141,35585.734.35$7,091
Nov 20105371280.843.80$6,987
Oct 2010281,35378.103.51$6,934
Sep 2010341,35472.633.98$7,858
Aug 20103598673.684.42$6,936
Jul 2010097272.554.74$4,604
Jun 20103078270.364.91$5,951
May 20103077571.124.24$5,416
Apr 20102075281.694.12$4,734
Mar 2010391,09178.394.39$7,845
Feb 20101687973.585.44$5,961
Jan 2010441,34774.365.96$11,305
Dec 2009252,09571.445.48$13,274
Nov 20092379574.593.75$4,698
Oct 2009221,67372.544.11$8,472
Sep 200901,02265.543.06$3,132
Aug 20092882567.423.22$4,543
Jul 2009077761.133.46$2,692
Jun 20091882966.163.90$4,420
May 200901,41254.743.93$5,543
Apr 20093463346.773.59$3,861
Mar 2009241,40042.144.06$6,694
Feb 2009461,29032.814.63$7,486
Jan 2009301,91735.865.37$11,372
Dec 2008471,63937.105.98$11,540
Nov 20082870255.496.86$6,370
Oct 2008351,90275.246.92$15,799
Sep 2008491,242101.767.88$14,770
Aug 2008272,103114.228.48$20,924
Jul 200830882131.0811.39$13,978
Jun 200801,217131.3313.03$15,861
May 200811741123.1711.57$9,931
Apr 200830553110.3110.45$9,091
Mar 2008192,281101.909.66$23,980
Feb 20083589092.538.77$11,044
Jan 2008203,13390.388.21$27,516
Dec 2007161,67988.337.30$13,673
Nov 2007492,37991.677.29$21,839
Oct 200702,08482.856.92$14,425
Sep 2007353,16275.846.24$22,398
Aug 200701,98169.066.39$12,655
Jul 2007472,93370.906.39$22,068
Jun 200701,05062.007.55$7,926
May 2007824,12958.747.85$37,214
Apr 200702,56259.617.81$19,997
Mar 200721,15756.927.30$8,562
Feb 2007141855.108.22$919
Jan 200701,19250.306.73$8,018
Dec 200603,13356.656.92$21,675
Nov 200604,90954.207.62$37,394
Oct 200603,69254.906.01$22,203
Sep 200605,13560.085.04$25,866
Aug 200606,69768.717.34$49,155
Jul 200606,33269.376.34$40,162
Jun 200605,92766.286.38$37,837
May 200608,71666.016.42$56,000
Apr 200608,15164.397.36$59,995
Mar 200609,03556.707.08$63,994
Feb 200608,67357.597.75$67,225
Jan 200608,95360.598.93$79,980
Dec 2005010,50754.9413.42$140,956
Nov 2005011,48554.6910.59$121,608
Oct 2005013,08258.3413.80$180,476
Sep 2005012,41361.4512.08$149,937
Aug 2005015,48161.519.80$151,665
Jul 2005016,99455.697.84$133,295
Jun 2005014,17052.337.38$104,589
May 2005018,72945.226.65$124,570
Apr 2005018,54449.207.36$136,493
Mar 2005020,89450.377.15$149,494
Feb 2005019,55645.226.31$123,436
Jan 2005022,17443.166.32$140,188
Dec 2004020,87539.866.75$140,929
Nov 2004020,76545.286.33$131,451
Oct 2004016,90749.706.52$110,151
Sep 2004015,63543.245.28$82,614
Aug 2004016,33142.375.55$90,648
Jul 2004013,66638.286.08$83,146
Jun 2004015,47936.106.43$99,577
May 2004012,77337.486.49$82,955
Apr 2004010,29734.475.86$60,325
Mar 2004012,09434.365.53$66,882
Feb 20040032.455.51$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2015 — as filed, then multipliedworked
Condensate             3 bbl  × $ 40.16 =       $120
Gas                    0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                     $120

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/200361 is the state's own key, not one this site invented.